shelving tests: who should pass | 1/2/11 | all staff from Circ, Public Services and Tech Services |
Managers Task and Decision Log
Note: to insert a row, right click on the row. To search the list, go up to Edit -- "Find on this page"
Move completed tasks to "Completed Tasks" tab
Current Tasks
Excel Sheet Link
heading |
Date |
Date Complete |
task - and action person |
Limited cards | Mar 28, 2012 | Nicole, to see how many General Delivery addresses at Post Office. and how many patrons have >50 items checked out. | |
Weekend hours survey | Mar 28, 2012 | Nicole, to survey patrons to see if there is a preference for later weekend hours (such as 2-6:00) | |
Grants wish list | 2/8/12 | Sam will create table at P:grants:wishlitforpossiblegrantfunding so staff can enter ideas | |
Web 2.0 tasks | 2/8/12 | Kathy and Bailey will work on signs advertising our apps, QR codes, etc. Also signs for ebooks when Freading is live. | |
Outside Signs | 1/7/2012 | Ruth will research sign placements and sign structures | |
Wireless concerns | 12-28-11 | Training needs to take place on the correct procedure in the event of a wireless failure / concern. | |
Stats collecting | 12-28-11 | sms to give direction on correct stats collecting. Pages set up and people asked to contribute. | |
FOL web page | 12-28-11 | who updates/monitors FOL web page? sms to inquire and direct. | |
Insurance questions | 12-28-11 | multiple situational questions regarding insurance coverages. sf to inquire and document. | |
Website wallpaper | 12-28-11 | md is to purchase 'artisits ear' to publish new website wallpaper with funds from the foundation. | |
Building Emergency flow chart | 12-28-11 | sf and md are refining the document for use in the event of a building emergency. | |
ebooks | 10-12-11 | Kathy Marquis and Nathan Bender will look at ereaders, ebooks, and Overdrive other service providers. Consult with other libraries. | |
Simplifying Public Drive | 8 -24-11 | Devise suggested format for revised public drive: NEB and MD to report on Sept. 22. | |
Integrating Folios | 8/10/11 | Kathy and Nicole will discuss how to integrate folios into the rest of non-fiction. Kathy will also talk with Susan about a global change in the Sirsi for them | |
Sub Position | 8/10/11 | Susan will draft a job description for a permanent sub position, for 10 hours a week Drafted and posted. | |
Re-organization | 8/10/11 |
Kathy will make a list of changes to do in the library, one of price and the other for impact? - to discuss in the second managers meeting from today. Susan has double-checked which areas we are limited to re-carpeting |
|
Strategic Plan | 8/10/11 | Everyone look over Marjorie's Strategic Plan draft and proposed schedule done | |
Web page updates | 7/27/11 | Marjorie is sending around a draft list of ACPL web page sections and who might update them, for review by managers. | |
Web 2.0 meeting | 7/27/11 | A meeting is set to have managers discuss Library Web 2.0 draft with Erin, on August 2 at 10:30. | |
Color Collection Coding stickers | 7/27/11 | Nathan will look into costs of color collection coding stickers for library books from various dealers. | |
Sub Rates | 5/25/11 | Betsy is working on forming rates for subs, depending on what the level the sub knows. | |
Evaluation Checklists | 5/25/11 |
Use if want to, in conjunction with written paragraph
Tamara? will consult with Rodney if comments could be obtained by an internal server
Kathy will make a checklist to use for 3 and 6 month reviews |
|
Emergency call list | 5/11 | Betsy updating, will post on bulletin boards and otherwise distribute to staff | |
Job titles in PS | 4/13 | Kathy and Tamara will discuss jobs w/same titles but different duties | |
125th Anniversary | 4/13 | Susan will talk to the Board about ideas for a party/celebration/activities | |
Evaluation forms/job descriptions | 4/13 | Betsy is working on standardizing evaluation forms and substitute job descriptions | |
Elevator | 4/13 |
Nicole will get info and decision from circ staff about elevator closing/training
|
|
Guidelines related to children | 3/23/11 |
Draft revision of the Safe Child, unattended children, and problem patron guidelines - Susan and Tamara
Dual language handout to give directly to parents
Think about how to likk policy to procedures and guidelines so all related are updated - Susan and Betsy |
|
Children's comuters | 3/23/11 | Set children's computers to shut down 15 minutes before closing to allow children to call parents for pick up before closing. (Who is doing this?) | |
Revisions to Discipline/Grievance Policies | 3/23/11 | All managers to review and comment to Susan by 3/31 | |
ASP offenses | 2/2/11 | Kathy will look into paperwork that ASPs get for community service and begin keeping track of offenses for which they are sent here. The County Sheriff's office says they update the online registry every time someone new contacts them (as required.) | |
Time off without pay and health ins. | 2/2/11 | Betsy will inquire of Rodney (health ins liaison) about this - issue is coverage if number of hours dips below that required for coverage. | |
To-Do before Jan. 26 closed day | 1/12/11 |
Phone messages (problematic right now): Marjorie Signs posted 1 week before: Marjorie Closed banner to be hung: Micheal
|
|
Marjorie spreadsheets re: Godfrey Report, 5 Year/strategic plan/marketing plan | 1/12/11 | Marjorie will sit down with those concerned with the various segments | |
Harassment Policy | 1/12/11 | Susan has asked for staff input on the revisions to the harassment policy and had particular questions for the managers | |
Review "Leading Change" documents |
1/12/11 |
All managers review to see if there are any areas needing attention in relation to the current projects and possible changes in work areas or duties, to make sure we are not overlooking anything we should consider. |
|
Technical Services Librarian Job Search |
10/6/10 |
SMS will post job description and application for Technical Services Librarian |
|
Sick and vacation for Grant-funded hours |
10/6/10 |
SMS will write down clear information to be used for referencing, about sick and vacation for Grant-funded hours |
|
Teen Volunteers |
10/6/10 |
Kathy will write up her full understanding of handling teen volunteers |
|
Donation Forms
|
10/6/10 |
make more instructions for donations/filling out donation forms |
|
BJM |
9/22/10 |
Revise hiring of substitutes form |
|
BJM/SMS |
9/22/10 |
Draft fair pay rates for substitutes |
|
Generic Public Services Job Descriptions |
9/22/10 |
Kathy will draft a generic job description (because the public services assistants do not have all the same job duties) and Betsy will verify how Laramie County handles this. |
|
ILL/Sirsi |
9/22/10 |
Susan will follow up with Des re simplifying WF |
|
Purchasing Procedures |
9/22/10 |
Betsy passed out a draft to be returned to her for comment |
|
Marketing plan / Godfrey's recommendations |
8/25/10 |
Managers, Thomas, Deb K and Micheal will look at the list of Godfrey's recommendations (public/shared/brochure/godfreys.xlsb) and give feasibility input so Marjorie can work on a marketing plan for the library - to be done by September 23, 2010 |
|
|
6/17/10 |
Susan will present the following priorities for the Specific Tax Purpose money to the commissioners :
1 (ASAP) - Staff computer upgrades by changing the public computers to thin client, and engineering for a new server room. 2 - Bring the toilets to be ADA compliant and purchase a new reader printer 3 - Parking lot (during a summer) 4 - RFID and carpeting begin at same time, carpeting will be finished before RFID |
|
Walk-thru reschedule |
6/17/10 |
The in-charge/building walk-around has been rescheduled to 3:30pm - Betsy will consult people on which day this should be. |
|
Correct pay rates for subs |
6/17/10 |
Betsy will look at the procedures to determine how to define and pay substitutes |
|
Vouchers for reimbursing patrons |
5/26/10 |
For Circ:Vouchers need the following patron information: Full name, full address, e-mail address, phone number, amount, item name. Give this to Bookkeeping along with any documentation of what they paid for, minus the processing fee. |
|
Web site meeting |
5/26/10 |
Marjorie/ErinKathy/and Susan to meet today at 4 concerning Erin's training on the website |
|
Integrated system for web/calendar |
5/26/10 |
Marjorie & ?:E-Tapestry is very limited. If we don't pay will only handle FOL/FNDN/Volunteers. The newsletter list is currently an Excel spreadsheet that can't be uploaded at present. Currently everything is cobbled togther. |
|
Fee schedule |
5/26/10 |
All: Think about fees for damages |
|
Grant ideas |
5/26/10 |
All: Come up with ideas for grants that Paul could write. Computer lab? |
|
In-charge training |
5/26/10 |
All: Hold an in-charge training (Scheduled for 6/16/10) |
|
Orientation |
5/26/10 |
All: Postpone orientation. Betsy will follow up with new staff to make sure they meet deadlines if interested in signing up for insurance. |
|
Reorganization | 4/16/10 |
SMS will come up with agenda for follow up meeting, using notes from previous meeting (http://albystaff.pbworks.com/notes-from-building-assessment-meeting,-March-2010 |
|
Fees | 4/16/10 | booklets missing from CDs or DVDs: just charge $5 processing fee | |
IT | 4/16/10 |
tech emergency procedures (if TS is not on IT time): printer problems: try another printer; no printers working at all, call TS *if* he is already coming in. otherwise call county IT | |
IT | 4/16/10 |
Tech Deputies: we will reinstitute this. TS will train dept. members to do basic IT tasks in his place | |
IT | 4/16/10 | quarterly technology needs meetings - TS will have with heads; update 5/12/2010 BJM, KM, and SMS scheduled still need NM and ??? |
|
PR |
2/10/10 |
We will have CJ box reading and signing Monday, April 5, at the AHC, at 7 p.m. in the Stockgrower's room. (AHC will set up chairs) |
|
IT |
2/10/10 |
We have our Outlook server and will be moving to new email addresses and url. Rodney or TLS will write instructions and explanation of what to expect. Susan has a list of places to notify. |
|
IT |
2/10/10 |
Thomas will get a firmer price, currently $200 a computer for 30 machines and ask for a demo of this public computer registration software. |
|
Staff calendar on web page |
2/10/10 |
MD will try a single calendar for staff with a link on the staff web page. We will try to three months and assess. |
|
Downstairs room |
2/10/10 |
KM will set up meeting with NI, BJM, BB, SMS to discuss further organization of the room. We need to confirm that big tables (from LMR) will or will not fit. 3/8/10: finishing off with artwork (KM) |
|
WYLD Skills checklists |
1/27/10 |
Supervisors will evaluate skills separately form the evaluations and note in personnel file. |
|
Evaluation |
1/27/10 |
All heads: Be sure evaluations include goals, achievements and comments. |
|
Orientation |
1/27/10 |
KM Will design chart for 2/10/10 showing orientation. |
|
Personnel filing |
1/27/10 |
TC/SMS--BJM hopes they will catch this up while she is gone. |
|
Orientation |
12/19/09 |
Review draft and finish discussion, thinking about things we should be including, but haven’t and the best point in orientation for each Betsy will add generic portions to the Heads Personnel folder for interview and reference questions by 12/30 |
|
Managers Decision log |
12/19/09 |
Kathy will revise the managers task/decision log and managers need to review this before each meeting. |
|
Comtronix training |
12/19/09 |
Betsy will ask what they could train us on. |
|
Stolen CDs |
12/19/09 |
Josh will see if there is a pattern and will ask Tara to make a clever sign |
|
Staff chairs |
12/19/09 |
Betsy will check the balance for equipment ($2,000 for supplies including equipment. Do any departments see a need for chairs besides administrative services? |
|
Monitor Filters |
10/21/09 |
Kathy (and Josh? Betsy?) will look for the computer screen/filter purchased by Stephen and see if we could have it available for patrons on request |
|
Data Space on Server |
10/21/09 |
We will have a conversation with MD about photos. SMS will e-mail RW about old dated files. Update: MD is deleting fuzzy, unattractive, and unpicturesque photographs--that will save a lot of space--as she has time. since we have more server space, the issue is not as pressing. This was fixed when County IT and TS redid the server in March 2010 |
|
|
|
|
|
Needs assess draft |
8/26/09 |
heads will look at and suggest changes; when final report is in, we will meet to discuss immediate change ideas and ideas which will wait for final decision about remodel/expand/build new building |
|
staff permissions |
|
Get list of permissions so clear who can access which drives – BJM will do |
|
building map |
9-18-07 |
We need a new map of the building. Kathy volunteered (Tara and Marjorie are working on a large map to go in the foyer) KM, TC, MD |
|
benchmarks or plans |
9-18-07 |
Susan asks department heads to think about plans for their departments (and later ask them to think about what benchmarks should be used) |
|
LCD projector for large mtg room |
various |
Still some ongoing changes… We'd like another projector; we don't want the only one we have attached to the ceiling CG will look into changing the angle of the PP projector 9-18-07 / Asked city council to fund. 3-3-08/funded/Film society to particpate in selection and wiring; being woprked on now, 10-15-08 We have $2500 for this 1/09, ordered 2/09 Projector has arrived and Kathy has arranged a meeting with the film society and Betsy to discuss what needs to be done to finish this project. Most of wiring is installed; need more connectors, lock and splitter, but much progress made; have worker to paint stand (6/30/09). BAM has asked RBOt to come in for final review--can public really use it? (11-23-09). DK has written instructions; RR has made one final change. SMS asked for no changes for a while. |
|
Outdated and unknown administrative procedures |
2/13/08 |
will review a page a week, revised bjm/sms will review and jb will scan . We will flag mandatory updates. |
|
problem patron training |
|
to be scheduled by Betsy and also need staff input for problem patron guideline update 2 (7/29/08)/discussion with LPD and Peak Wellness held; guideliness still need revision ad board review (10-26-08). Board approved new code of conduct and staff trainined (May 2009). Revised signs up? Yes |
|
staff liaison job description |
(7/29/08) |
BJM: Send out again-are there things staff could do-concerns about getting to bank-1 yr. appointment |
|
staff meetings |
10-8-08 |
BJM, SMS: Try one before opening, one after? Survey staff and see what times would be good (10-8-08). Tried 2 on a Wednesday. C. 10-12 people. |
|
Library blog for staff only? |
10-8-08 |
Probably not. Too many hoops for current web page. Could put board summary on web page though; want searchability (10-8-08). |
|
list of orientation topics |
Jan 08 |
for 1/14/08 meeting, Betsy and Kathy will make up list and who should train for each topic 12/10/08, draft circulated and revised, 2/09 4/09: BJM still tweaking. Has tested with 3 new staff. |
|
Network permissions |
|
BJM: Investigate what all staff can view, Staff need to view most P drive, except some Admin., Staff need to be able to see job descriptions, ,KM needs children's permissions. Establish what all need to view. New Employee Supervisor sheet needs revised to reflect what people need permissions to change. |
|
Shelving tests for volunteers |
|
Create tests for volunteers for specific areas (childrens, etc.) JP will do all LImit test items to 25, including misleading ones Give mixed test if they have no specific area of interest "Open Book" test, encourage to ask questions Shelving tests should be checked asap, in under one hour |
|
Disaster planning |
|
MD will work on PR response to disaster planning to present at Oct. 14 meeting. There will be staff meeting discussion of how to handle things if the library needs to close during a pandemic. |
|
Evaluation Procedure |
|
Look at procedure in Administrative Procedures Current to see if we need to make changes. Emphasize that we should not be just cutting and pasting comments received, but are extracting only the pertinent points. (Need to remove anything that identifies the person making the comment. |
|
Basment mtg area |
2009 |
Public Services staff will select area rugs, then paint, an ASP will then do the painting and moving of furniture. Tables were discussed. The brown tables currently in the meeting room are 1/2 inch taller than the white tables (28 3/4") |
|
|
|
|
Decision log
heading |
decision |
date of decision |
Sorting Shelves/cart | Nicole and kathy? will see if carts can be left by their subject area rather than in the WORK ROOM. | |
Tax Program | Susan or Sarah will deliver the tax cart to the AV closet. The door should be left open but locked. then Susan or Sarah will pick upk the cart and move it back to Sarah's office. | |
Visitors | All visitors, anyone not paid staff, will be announced--staff will call employee to ask if available. We won't just wave people back to staff areas. | 2/22/12 |
Harassment and Record Updates | Sexual Harassment and Record updating will be done once a year - January - but not connected to the yearly evaluations. This year's will be done after the Sexual Harassment training | 5/25/11 |
Evaluations |
type evaluation comments on paper and give to supervisor - not email, because all email is subject to viewing
if a person has two positions in differing departments, the person will receive two yearly evaluations |
5/25/11 |
Eric P. | Nathan has assumed supervisory responsibilities for Eric's duties | 4/13/11 |
Children's computers | Have them set to shut down 15 minutes before closing to give children time to call parent for a ride home before closing | 3/23/11 |
shelving tests: who should pass | all staff from Circ, Public Services, and Tech Services | 2/2/11 |
Contracts |
A copy of all signed contracts and agreements will be kept in the central files |
9/22/10 |
Teen Volunteers |
We can have teen volunteers. There are limits to what they are allowed to do, and they must record their time on a sheet (like all other volunteers) - see "Current Tasks" |
10/6/10 |
Sick and vacation for Grant-funded hours |
Have sick and vacation accruals for Grant-funded hours if the grant allows for it - see "Current Tasks" |
10/6/10 |
Documents emailed to all |
Susan wants comments |
9/22/10 |
YA programming Job Desc (grant/temp.) |
Betsy will finalize before Oct. 9. |
9/22/10 |
License agreements |
All must be signed by Susan and they will be filed in the staff room files |
9/22/10 |
Library Snapshot Day |
We will participate with potentially Marjorie and Erin splitting the day to take photos |
9/22/10 |
Subs |
Monitor whether there are problems getting anyone to sub as page |
9/22/10 |
Public Services Folder |
Kathy will create a folder. The detailed programming funds reports will be saved to it. She will also be moving files from the old Adult Services folder. |
9/22/10 |
Fund names |
Betsy will give each department a list of fund names (on cardstock) so that they will use the correct fund name when logging purchases |
9/222/10 |
Staff room files |
All original grant documents will be given to Betsy to be filed in the staff room cabinets under a heading of Grants-DOH (or whatever the grant name is) |
9/22/10 |
ILL Subs |
Betsy will verify the training level with achieved with Bernie. They have not yet reached sub ready. BJM to follow up with BBW the beginning of December. |
9/22/10 |
Donation Form |
|
9/22/10 |
Levels of training |
1. Job ready (can handle all responsibilities of position) 2. Sub ready (can handle major portion(s) of position) 3. Place- holding (can handle minimal tasks of position) training complete = finished training for appropriate level |
8/25/10 |
HOLDS | Nicole will change message to 8 (not 7) days | |
Mgrs meet START TIME |
Will meet at 2, not 1 now (Mgrs. Meetings) |
1/27/2010 |
New carpet & days we are closed |
-- Move Board meeting to March 30?? When we are closed have sexual harassment training and verbal judo training. |
12/30/09 |
New Carpet |
We will be closed Sun - Tues Mar 14-16 |
(12-30-09) |
Driving record |
Hiring is not complete if a person required to drive has not provided a driving record by check-in |
(11-11-09 |
Non circ staff schedules |
In Public;schedules; be sure your area is up to date (11-11-09). |
(11-11-09 |
Robo-calls for reserves |
At $120/year, we'll do it (11-11-09) Didn't say who would make the contact and agreement. |
(11-11-09 |
In-charge if supervisor is out |
Be sure to have cell phone numbers for all supervisors (11-11-09). |
(11-11-09 |
Saturday in charge |
Nora is it (11-11-09) |
(11-11-09 |
Display List |
Kathy made a list of current book displays and gave it to Circ |
(10/21/09) |
Additions to Daily Announcements |
Public Services, as well as other departments, will start including more items in the Daily announcements. One of these that should help communication is when any sort of library program has been announced and possibly another announcement when this program begins.(10/21/09) |
(10/21/09) |
Quick Closing Call List |
BJM is working on the list, but here is a small list of what has changed (10/21/09)
|
(10/21/09) |
Photos of staff |
Put photos of staff in the staff room. Take photo at check-in one copy to personnel file, one on staff mail basket |
2009 |
Reorganization of basement after Paul moves upstairs |
Move the safe to the south wall Move out the magazine unit Move the gray desk over to that spot use the large wooden unit as a divider |
2009 |
Communicating with Administration |
|
|
Reorganization Assessment |
Need an IT person. In FY09 10 budget (sms) |
7-29-08 |
Pay for subs |
|
(revised 10-17/08), 6/19/07various |
Tracking decisions |
No specific minutes, just a to do list from meetings - on this table |
n.d. |
meeting protocols |
|
071114 |
incident log |
Keep in public drive (p:) at the top layer so people can find easily, but not available in wiki - Tara will do |
10-8-08 |
sign protocols |
MD uses lime for aclf; yellow for fol. Font for signs: those with PCs use Comic Sans MS (Marjorie uses similar MAC font.) |
10-8-08 |
calendar |
We're a go with Happy Jack software. (later development: Marjorie is looking at it and has set up October in the calendar) Is a link on the web page and used for vacations and meeting rooms. |
9-18-07 |
mgrs meeting frequency |
We will try for bi-weekly meetings; issues are falling through the cracks. 9-18-07/ moved to monthly meetings in December. |
9-18-07 |
mgrs meetings |
Meetings will be 3rd Tuesday of each month - Changed to 1st and 3rd at 2:15 (9/18/07)/Changed to 2nd Wednesday in December; time changed to 1:45 in February. time changes to 1 in May. 2nd and 4th Wednesday at 2 ; MD will come the 2nd Wednesday to report( |
6-10-09 |
new book item type |
Agreed to make "NEW" a location rather than an "ITEM TYPE" |
7/16/07 |
timesheets |
keep up with weekly |
n.d. |
public or wiki? |
Currently do everything on the Wiki |
n.d. |
cords to equipment |
Need to be labeled and kept with equipment. |
n.d. |
old online files |
put old files into pre-2006 directories |
n.d. |
summer Sunday hours |
Stay open this summer and assess at the end of the summer/worked very well |
2008? |
VTC recorded |
salaried employees are requested to record time as accurately as possible to keep track of how much time they work (bjm,sms,sns, ni, km, rh, ds, ss) |
7/29/08 |
Probation updates |
We will be working on doing probational assessments every 2 months for new employees. |
1/09 |
Checklist for new employees |
Betsy will save a copy of the supervisor's sheet to Heads/Personnel/Job Searches |
|
Quick Closing Call list |
BJM will update so that Marjorie is the first one called and she will call others. All need to review list to see if any changes are needed. A print copy will be posted outside BJM's office under the emergency light to be used in case of a power outage. |
|
evaluations |
decided to do these on hiring anniversaries so they're not due all at once - not sure of date in 2009 |
2009 |
Evaluations Annual
|
Summarize those on the evaluation form (no names) and
|
12/19/09 |
Pre - Probation End reviews
|
|
12/19/09 |
Managers task list |
person in charge of next meeting will email wiki link to all, by at least the day before the meeting |
12/19/09 |
Brainstorming on the building assessment report |
Bagels and coffee will be served (Who will buy the bagels and make the coffee?) This will be paid time. There will be a review of these thoughts at the end of the meeting. There will be follow up to the discussion |
12/19/09 |
all-staff meeting location |
Continue to hold around Josh’s desk so that minutes may be taken and Tracy will be able to view what’s being discussed |
12/19/09 |
Completed Tasks
heading |
task |
date
|
|
|
|
|
|
|
Special Meeting |
Meeting with Susan, Kathy, and Nicole for ON-THE-FLY, School librarians issuing public library cards, and Damaged Process |
10/6/10 |
Computers training |
Thomas has completed (in color) handouts with tutorials for computer training |
6/17/10 |
communication survey |
review and make comments to Susan by 12/30/08 - particularly about best method of letting staff know of information outside their dept. 12/10/08, conclusions drawn, daily email started 1/09, good staff meeting time still to be found |
12/10/08 |
IT |
Thomas will investigate prices for software that will make people check in and check out. |
1/27/10 |
IT position |
BJM, KM and JP will meet to draft job description for SMS and Rodney to review - they (what is there? sms )are at: Admin: Building: Building needs assessment: Godfrey's. IT applications coming in; preferred by date is 11-13 (11-11-09). |
8/26/09 |
stats for public computers |
Statistical sampling to be investigated; week of 6-28 will be collection dates. |
June 2009 |
Reorganize YA and browsing area |
Put plans on graph paper and be sure furniture will fit 2/22/09; meet 2/18 to assess. graphs available to move materials around, and staff informed. |
2/22/09 |
car seats for children |
Children under 9 need to be in them. Maybe ask for donations. MD brought this up.(10-8-08) (KM asks: in library? in van? don't understand) |
10-8-08 |
parking lot out in SE lot |
Replace to see if it's the bulb or not--need tall ladder(10-8-08) - BJM/ADH |
10-8-08 |
"in charge" |
need to clarify the meaning of this, who to call on weekends and evenings, at next staff meeting, 12/10/08, do at next staff meeting 2/11/09 -- BJM/SMS |
12/10/08 2/11/09 |
Giving out bookmark to patrons |
Circ will work on giving out one bookmark to patrons as they checkout. 1/09 |
1/09 |
Daily in-charge email |
In-charge person will try to send an update email to staff each day, at least when there's something to report. 1/09, assess 3/11/09 |
1/09, assess 3/11/09 |
Fire drill |
We will do a fire drill and try to include FOL. 1-09. Done |
1-09 |
Bulletin boards |
We will consolidate bulletin boards-eliminate board by staff room computer, do a board for continuing ed etc. stuff. Try putting in hallway. 1-09 |
1-09 |
Cassette boxes |
Tara will talk with Kathy about what to order. These are getting harder to find. |
|
Sign for meeting room |
Kathy will work with Nora on this. |
|
Photo permissions as condition of employment |
Susan will ask the attorney. |
|
Damaged audio Cds |
Evaluate condition and recommend a policy on charges for damaged ones. Will go to board for 45 day comment and approval. No rush, since we must put out a legal ad this could wait until there are other items requiring a legal ad. KM/BAM/Board |
2009 |
Children's materials to be shelved |
Piling excess on top of the low shelves is an issue. Assess the situation after a shelver is hired. SMS does not favor a return to sorting shelves. JP |
|
Probation reviews and evaluations |
KM & JP will work together to get these done. |
|
Old public color printer & printer issues |
Ask County IT to look at the old public color printer to see if it is usable. We need a better color printer for staff. Kathy's printer is the only working color one and it's not always working well. Tara's printer doesn't work well in color or b/w. Because patrons don't always realize they have chosen to print in color and don't want to pay, we need to investigate something like the old vendaprint system. The current b/w public printer is not the best one for public use. The toner is expensive and quickly used up. Susan mentioned County IT's idea of having a service contract on printers. Tara has ordered a color printer/scanner/copier/fax for her desk. Josh had mentioned in the past that if patrons want to print in color that staff will save their document to a jump drive, then print from the color printer for them, so that they pay for their color copy. BJM emailed CountyIT 9/23/09 to switch the Brother printer with (Deb's area) the HP. |
9/23/09 |
Flu shots |
BJM will resend info |
|
Admin procedures |
Revised driving/mileage to reflect CALibrate. |
sms |
Access/Info Station survey |
The survey needs to include circ/info station/programming. KM & JB will pull together information from their proposal 10/31/07 |
10/31/07 |
Happy Jack calendar |
Mona will build an external form for meeting room reservations. Marjorie recommends retaining the print meeting room book until we're sure the online is working properly. albyref will monitor the online reservations. We'll put vac/sick on the ABCPL calendar (name to be changed). 10/31/07 |
10/31/07 |
Boomerang ads |
Janet and Marjorie will work on condensing the information. All agreed they could not tell the difference between weekly and monthly 10/31/07 |
10/31/07 |
new Futures |
JB will talk with the Western State Learning Corporation about "new Futures," outreach to 6th graders and p for thinking about college and learning what needs to be done to get there. She will also investigate our participating in Paso a Paso, for Spanish speakers. These programs are free. 9-18-07. Schools are investigating. I'll be as involved as possible. JB Update: NF appears to want to work only with schools, not libraries. |
9-18-07 |
Anime club for teens |
Can we host an informal Anime club for Junior-senior high on some Saturdays? Yes, let's talk about this a bit and try it. 9-18-07 RH will work on this |
9-18-07 |
cash register |
CG will also look into pricing new cash registers that are more easily programmed 9-18-07 No money for this, though some very attractive features. (sms, 7/29/08 Too expenisve for degree of problem. |
9-18-07 7/29/08 |
staff meetings |
SNS will set up an agenda for the next staff meeting with the goal if increasing staff participation. The safety needs to stay however.. Anyone can add items to the staff meeting agenda( --or managers for that matter). He will try a different structure. 9-18-07 |
9-18-07 |
wiki use |
SNS needs to demo using the wiki; people aren't understanding the difference between editing and commenting 9-18-07 |
9-18-07 |
Weekend staffing |
7/16/07 |
|
Missing video games and CDs |
Video game discs will be kept at circ in a case loaned by Chris. Their cases will remain on the shelf and the disc will be put in it at the point of check out. 6/19/07 |
6/19/07 |
Book drop on Monday |
Staff signing up? |
|
staff comments |
Revise and send response to staff comments passed along by the staff liaison at the last staff meeting. 6/19/07 |
6/19/07 |
Pay for subs (discussion) |
Clarify why not paid for rate of job being subbed for, check policy and procedures |
|
People feeling stressed/stretched |
Explore new ways of doing jobs |
|
Meeting room equipment |
need to handle locking up projector |
|
Laramie Jubilee Days 2007 |
Yes we will suggest programs |
|
sexual harassment training |
Betsy to arrange for December; some staff/volunteers still need to see the DVD |
2/13/08 |
Managers List |
Divide this list between done and not done so more easily useful - KM will do |
(10-8-08). |
Breaks |
People don't know how long their breaks can be. Ask their supervisors |
(10-8-08) |
Communication Survey |
Draft to heads for suggestions (SMS), respond by 10-21, and then to staff. |
10-8-08 |
phone message |
Messages could be more helpful, phone messages have been redone, 1/09 |
1-09 |
in-charge training/review |
When JP returns after 7-7-09 |
7-7-09 |
Passwords |
Review and determine who should have them/where they're kept Return to sms. |
(6/10/09) |
de-clutter library A |
Too many signs, no good single display space. Find display rack and use--give patrons only trifold and pin. Make all new signs. MD uses lime for aclf; yellow for fol (10-8-08). |
10-8-08 |
de-clutter library B |
Current paper too floppy; use cardstsock for signs (10-8-08). |
10-8-08 |
Fall Open House |
Decided to go to schools to catch all parents, not just those who come to library ready. MD will set up schedule and staff will volunteer. (July 2009) MD reports going well (9-9-09). Done. MD ran evaluations with staff. |
9-9-09 |
|
|
|